The busy stretch for this desk is the month the utility notices go out, when every 2-inch assembly is due the same week. The calls are not identical, but they share assembly size, type, and whether this is the annual test or a repair.
Union does not greet a seasonal rush with a generic lead form. Each call gets assembly size, type, and whether this is the annual test or a repair on its own note. The Assembly test minutes turns that into minutes on site so two jobs are not treated as the same size.
A passing test is a gauge reading and a report. A failed check valve is a repair, not a second try with the same form.
A certified tester runs the gauge and files the report. Union does not rebuild the valve. A season is a stack of notes, not one slogan. Lite is $99 per month, 1 seat, including when the stack is tall.



